Can you build an ADU in New Lebanon, NY?

Town of New Lebanon has 8 districts. 4 districts allow ADUs, 2 do not, 2 require a special-use permit. Check your address to confirm the district that applies to your parcel:

Check my address for ADU feasibility → Free · no account needed to start

What the New Lebanon code indicates by district

The table below shows how each district treats ADUs, alongside the lot and setback standards that govern a second unit. District boundaries and conditions vary, so treat this as a starting point and confirm the district that applies to your parcel.

District Min lot Setbacks F / S / R Max height ADU
Rural Agricultural (5-acre) 5 ac 75 / 75 / 75 ft 35 ft As of right
Rural Agricultural (2-acre) 2 ac 75 / 50 / 50 ft 35 ft As of right
Rural Agricultural (1-acre) 1 ac 75 / 35 / 50 ft 35 ft As of right
Commercial 0.6887 ac 75 / 20 / 25 ft 40 ft Special permit
Commercial Corridor 0.6887 ac 50 / 15 / 25 ft 50 ft Special permit
Commercial Recreation 0.6887 ac 20 / 25 / 25 ft 40 ft No
Commercial Industrial 0.6887 ac 75 / 50 / 50 ft 40 ft No
Commercial Residential 1 ac 75 / 35 / 50 ft 35 ft As of right

Rural Agricultural (5-acre) — Maximum footprint of the principal building 10,000 sq ft — a square-foot cap, not a percentage, which is why no coverage figure is recorded. Minimum ROAD FRONTAGE is 60 ft — Schedule 1 publishes a road frontage but NO minimum lot width, which is why that field stays empty. The front setback is measured from the CENTRE OF THE TRAVELLED PORTION OF THE ROAD (schedule note 3), not from the property line. Overlay districts carry additional area and bulk requirements of their own (note 1).

Rural Agricultural (2-acre), Rural Agricultural (1-acre) — Maximum footprint of the principal building 4,000 sq ft — a square-foot cap, not a percentage. Minimum ROAD FRONTAGE is 60 ft — Schedule 1 publishes a road frontage but NO minimum lot width, which is why that field stays empty. The front setback is measured from the CENTRE OF THE TRAVELLED PORTION OF THE ROAD (schedule note 3), not from the property line. Overlay districts carry additional area and bulk requirements of their own (note 1).

Commercial — The 30,000 sq ft minimum does NOT apply to a wholesale store, hotel or motel, each of which needs two acres (note 4). The side yard becomes 50 ft where the lot adjoins a RESIDENTIAL ZONE and 40 ft where it adjoins an existing building (note 5) — both larger than the figure above, and adjacency is not a condition axis. Minimum ROAD FRONTAGE is 100 ft — Schedule 1 publishes a road frontage but NO minimum lot width, which is why that field stays empty. The front setback is measured from the CENTRE OF THE TRAVELLED PORTION OF THE ROAD (schedule note 3), not from the property line. Overlay districts carry additional area and bulk requirements of their own (note 1).

Commercial Corridor — The front setback is a RANGE: 50 ft minimum and 100 ft MAXIMUM. The 30,000 sq ft minimum does NOT apply to a wholesale store, hotel or motel, each of which needs two acres (note 4). The side yard becomes 50 ft where the lot adjoins a RESIDENTIAL ZONE and 40 ft where it adjoins an existing building (note 5) — both larger than the figure above, and adjacency is not a condition axis. Minimum ROAD FRONTAGE is 100 ft — Schedule 1 publishes a road frontage but NO minimum lot width, which is why that field stays empty. The front setback is measured from the CENTRE OF THE TRAVELLED PORTION OF THE ROAD (schedule note 3), not from the property line. Overlay districts carry additional area and bulk requirements of their own (note 1).

Commercial Recreation — The 30,000 sq ft minimum does NOT apply to a wholesale store, hotel or motel, each of which needs two acres (note 4). The side yard becomes 50 ft where the lot adjoins a RESIDENTIAL ZONE and 40 ft where it adjoins an existing building (note 5) — both larger than the figure above, and adjacency is not a condition axis. Minimum ROAD FRONTAGE is 200 ft — Schedule 1 publishes a road frontage but NO minimum lot width, which is why that field stays empty. The front setback is measured from the CENTRE OF THE TRAVELLED PORTION OF THE ROAD (schedule note 3), not from the property line. Overlay districts carry additional area and bulk requirements of their own (note 1).

Commercial Industrial — C-I is the one commercial district whose 30,000 sq ft minimum carries no wholesale/hotel exception. Minimum ROAD FRONTAGE is 200 ft — Schedule 1 publishes a road frontage but NO minimum lot width, which is why that field stays empty. The front setback is measured from the CENTRE OF THE TRAVELLED PORTION OF THE ROAD (schedule note 3), not from the property line. Overlay districts carry additional area and bulk requirements of their own (note 1).

Commercial Residential — THE BASE ROW IS THE RESIDENTIAL CASE. Schedule note 2 gives C-R no figures of its own: a RESIDENTIAL use takes the RA-1 District's area and bulk regulations, which is what the base row holds, and a COMMERCIAL use takes the Commercial District's — recorded as a variant. Minimum ROAD FRONTAGE is 60 ft — Schedule 1 publishes a road frontage but NO minimum lot width, which is why that field stays empty. The front setback is measured from the CENTRE OF THE TRAVELLED PORTION OF THE ROAD (schedule note 3), not from the property line. Overlay districts carry additional area and bulk requirements of their own (note 1).

ADUs vs. short-term rentals in New Lebanon

Short-term rentals allowed with local rules for Town of New Lebanon. Local Law No. 3 of 2023 (zoning amendments adopted Aug 2023) includes STR provisions requiring a local contact person within 20 miles and prohibiting STR use of ADUs for three years post-CO. These are separate questions from whether you can build an ADU — a unit you're allowed to add isn't automatically one you're allowed to rent nightly, so check both.

Good to know

ADU FAQ — New Lebanon, NY

Are ADUs allowed in New Lebanon, NY?

Town of New Lebanon has 8 districts. 4 districts allow ADUs, 2 do not, 2 require a special-use permit. Check your address with the free ADU checker, or confirm with the building department at (518) 794-8884.

Do I need a special permit for an ADU in New Lebanon?

It depends on the district: 2 of 8 require a special-use permit, the rest do not. Check the district that applies to your parcel before you design.

Can I use an ADU as a short-term rental in New Lebanon?

Short-term rentals allowed with local rules for Town of New Lebanon. ADU occupancy and short-term-rental rules are separate: an ADU you can build isn't automatically one you can rent nightly. Confirm both before you count on STR income.

What an ADU costs to build in New Lebanon

Permission is one question and budget is another. An 800 sq ft accessory unit here runs roughly $195k–260k at a standard finish, and the per-square-foot rate comes in above a full house because the kitchen, bath, panel and heating plant cost the same either way. See the full cost to build an ADU in New Lebanon, priced by size.

ADU information for Town of New Lebanon is compiled from the municipal code (last reviewed 2026-06-02) and provided for decision-support only — not legal or architectural advice. ADU eligibility, size, owner-occupancy and permit conditions vary by district and often carry exceptions; verify with the building department at (518) 794-8884 before relying on any answer. Source: Offsite / Aldo zoning dataset, municipalData.js.