Holland · ADU cost
What it costs to build an ADU in Holland, NY
An 800 sq ft accessory dwelling unit in Holland runs roughly $200k–260k, or about $249–327/sq ft, and that per-square-foot figure sits deliberately above the $204–268/sq ft a full house costs here. An ADU still needs one whole kitchen, one whole bath, its own service panel and its own heating plant no matter how small you draw it, and those costs do not shrink with the floor plan, so they land on half the square footage and push the rate up. Whether the town will let you build one is a separate question from what it costs, and it gets answered parcel by parcel rather than townwide, since the Town of Holland maps 6 districts that treat accessory units differently from one another, so read the table below as a starting point rather than a verdict.
ADU cost by size in Holland
Standard finish, slab on grade, on a flat and clear part of the lot, general-contractor margin included. These are structure costs at Erie County pricing, before the service and septic work a second dwelling can trigger.
| Size | Type | $ / sq ft | Estimated total |
|---|---|---|---|
| 400 sq ft | Studio | $331–$433 | $130k–175k |
| 600 sq ft | One bedroom | $276–$362 | $165k–215k |
| 800 sq ft | One bedroom, larger | $249–$327 | $200k–260k |
| 1,000 sq ft | Two bedroom | $233–$305 | $235k–305k |
400 sq ft — One room plus a bath. Garage conversions and small backyard cottages land here.
600 sq ft — The most common detached build - a real bedroom, full kitchen, one bath.
800 sq ft — Room for a proper living area. Still a single bath and one kitchen.
1,000 sq ft — About as large as most codes allow an accessory unit to go.
Why the rate is higher than a house
The systems below are priced for an 800 sq ft unit. The middle column is what each system would cost if it simply shrank with the floor plan; the left column is what it actually costs once you account for the equipment a dwelling needs one of regardless of size. The gap between the two columns is the whole reason small builds price the way they do.
| System | $ / sq ft in an ADU | If it scaled with floor area | Fixed per unit |
|---|---|---|---|
| Site work | $7–$11 | $7 | — |
| Foundation | $16–$23 | $16 | — |
| Framing | $25–$32 | $25 | — |
| Envelope - roof, siding, windows | $32–$41 | $32 | — |
| Plumbing | $28–$34 | $16 | 55% |
| Electrical | $18–$24 | $13 | 35% |
| HVAC | $23–$28 | $15 | 45% |
| Insulation | $7–$9 | $7 | — |
| Interior finishes | $32–$43 | $27 | 15% |
| Millwork & cabinetry | $18–$28 | $11 | 55% |
The fixed-per-unit share is a modeling assumption, not a figure from the code: it is our estimate of how much of each system's budget buys equipment a dwelling needs exactly one of - a kitchen rough-in, a bath group, a service panel, a heating plant - and therefore does not shrink when the unit does. Site work, foundation, framing, envelope and insulation are treated as scaling straight with floor area, which understates the premium slightly, because a small building carries more envelope per square foot of floor than a large one.
What the Holland code says about accessory units
Whether you can build one, and how large, is decided by the district your parcel sits in rather than by the town as a whole. The table shows how each mapped district treats ADUs alongside the lot and setback standards a second unit still has to fit inside. District boundaries and conditions vary, so treat it as a starting point and confirm the district that applies to your parcel.
| District | Min lot | Setbacks F / S / R | Max height | ADU |
|---|---|---|---|---|
| Rural Residential and Agricultural District | 5 ac | 50 / 40 / 40 ft | 35 ft | No |
| Medium Density Residential District (R-2) | 1.377 ac | 50 / 20 / 40 ft | 35 ft | No |
| Medium Density Residential District (R-1) | 0.23 ac | 25 / 10 / 30 ft | 35 ft | No |
| General Business District | 2 ac | 40 / - / 30 ft | 35 ft | No |
| Highway Business District | 0.918 ac | 40 / 15 / 30 ft | 20 ft | No |
| Manufacturing and Industrial District | 3 ac | 50 / 25 / 30 ft | 30 ft | No |
Size limits on record in Holland
Where the code states a size cap, it decides which row of the cost table above actually applies to you. These are the caps recorded for Holland:
- Rural Residential and Agricultural DistrictEach unit of a two-family must average at least 720 sq ft, or 960 sq ft on the ground floor if built on two levels
- Medium Density Residential District (R-2)Each unit of a two-family must average at least 720 sq ft, or 960 sq ft on the ground floor if built on two levels
- Medium Density Residential District (R-1)Each unit of a two-family must average at least 720 sq ft, or 960 sq ft on the ground floor if built on two levels
- General Business DistrictEach unit of a two-family must average at least 720 sq ft, or 960 sq ft on the ground floor if built on two levels
- Highway Business DistrictEach unit of a two-family must average at least 720 sq ft, or 960 sq ft on the ground floor if built on two levels
- Manufacturing and Industrial DistrictEach unit of a two-family must average at least 720 sq ft, or 960 sq ft on the ground floor if built on two levels
Costs an ADU adds that a house does not
- Septic and water A second dwelling adds bedrooms to the design flow, which on an unsewered parcel often means expanding or replacing the existing system rather than tapping it. This is the single most common reason an ADU budget moves after design, and it is site-specific enough that no model should quote it - get it evaluated early.
- Utility service National Grid territory. A detached unit needs power run to it, and whether it goes on its own meter or subfeeds the main house changes both the cost and the permit path.
- Access and parking Many codes require an added parking space for the accessory unit, and a detached unit usually needs a driveway extension or a path, both of which count against a lot-coverage or impervious-surface cap.
- Short-term rentalsShort-term rentals restricted. Short-term rentals require a SPECIAL PERMIT: § 120-49.3 sits in Article VI, Special Permit Uses, of Zoning Chapter 120. Because the permission is discretionary, an STR is not available as of right, and the Planning/Zoning Board conditions govern. Confirm the current standards with the Town before listing. New York State's 2025 short-term rental registry (Ch. 99 of the Laws of 2025) separately requires every host statewide to register the unit regardless of local law. Confirm with Town of Holland at (716) 537-9443 before listing. Separate question from whether you can build the unit.
- Building dept(716) 537-9443
Sizing up a specific parcel in Holland?
Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.
Building a full house instead?
A standard-finish house in Holland runs $204–268/sq ft, about $370k–480k at 1,800 sq ft , plus roughly $1,679 for a conforming lot. See what it costs to build a house in Holland.
ADU cost in nearby towns
All Erie County towns: Buffalo (City) · Lackawanna (City) · Tonawanda (City) · Alden · Amherst · Aurora · Boston · Brant · Cheektowaga · Clarence · Colden · Collins · Concord · Eden · Elma · Evans · Grand Island · Hamburg · Lancaster · Marilla · Newstead · North Collins · Orchard Park · Sardinia · Tonawanda · Wales · West Seneca · Akron (Village) · Alden (Village) · Angola (Village) · Blasdell (Village) · Depew (Village) · East Aurora (Village) · Farnham (Village) · Gowanda (Village) · Hamburg (Village) · Kenmore (Village) · Lancaster (Village) · North Collins (Village) · Orchard Park (Village) · Sloan (Village) · Springville (Village) · Williamsville (Village)
More on Holland: Can you build an ADU here? · Zoning for new construction · Erie County build cost
ADU cost in Holland: common questions
How much does it cost to build an ADU in Holland, NY?
An 800 sq ft accessory dwelling unit in Town of Holland runs roughly $200k–260k at a standard finish, general-contractor margin included. A 400 sq ft studio runs about $130k–175k. Those are structure costs on an easy site and do not include the septic, water or electrical service work a second unit often triggers.
Why does an ADU cost more per square foot than a house in Holland?
Because a lot of a dwelling's cost is per dwelling, not per square foot. One kitchen, one bath group, one service panel and one heating plant cost about the same in an 800 sq ft cottage as in a 1,800 sq ft house, so on the smaller unit they get spread over less than half the floor area. That is why an ADU here prices at $249–327/sq ft against $204–268/sq ft for a full house, even though it is the same trades doing the same work.
Are ADUs allowed in Holland?
Town of Holland has 6 districts. All districts prohibit ADUs. Check the specific address with the free ADU checker or confirm with the building department at (716) 537-9443 before you spend money on design.
Can I rent an ADU in Holland short term?
Short-term rentals restricted for Town of Holland. ADU rules and short-term-rental rules are set separately, so a unit you are allowed to build is not automatically one you are allowed to rent nightly. Confirm both before you underwrite the build on short-term-rental income.
ADU costs are modeled estimates in current 2026 dollars at the Erie County regional index, general-contractor margin included, derived from Offsite's cost engine with a stated adjustment for the equipment a dwelling needs one of regardless of size. They are planning numbers for decision-support only - not a bid, quote, or guarantee, and not legal, architectural or engineering advice. They cover the structure and exclude septic expansion, utility service runs, site work beyond a flat and clear pad, and permit fees. ADU eligibility, size, owner-occupancy and permit conditions in the Town of Holland vary by district and often carry exceptions this page does not show; zoning last reviewed 2026-08-06; verify with the building department at (716) 537-9443 before relying on any answer. Sources: Offsite / Aldo cost engine (costEngine.js + constants.js); zoning dataset (municipalData.js).