Aldo

ADU · Orange County

Can you build an ADU in Harriman, NY?

Village of Harriman has 6 districts. 5 districts allow ADUs with occupancy restrictions, 1 does not. Check your address to confirm the district that applies to your parcel:

Check my address for ADU feasibility → Free · no account needed to start

What the Harriman code indicates by district

The table below shows how each district treats ADUs, alongside the lot and setback standards that govern a second unit. District boundaries and conditions vary, so treat this as a starting point and confirm the district that applies to your parcel.

District Min lot Setbacks F / S / R Max height ADU
Residential 0.344 ac 40 / 20 / 40 ft 35 ft Occupancy restricted
Residential 0.115 ac 25 / 8 / 35 ft 35 ft Occupancy restricted
Multifamily Residential 0.115 ac 25 / 8 / 35 ft 35 ft Occupancy restricted
Central Business 0.115 ac 20 / 0 / 0 ft 35 ft Occupancy restricted
General Business 0.344 ac 50 / 15 / 35 ft 35 ft Occupancy restricted
Industrial 0.918 ac 40 / 20 / 20 ft 50 ft No

ADUs vs. short-term rentals in Harriman

No local short-term-rental law on record - which is not the same as permission for Village of Harriman. No short-term-rental-specific chapter found in the Village code as of Jul 2026. These are separate questions from whether you can build an ADU — a unit you're allowed to add isn't automatically one you're allowed to rent nightly, so check both.

Good to know

ADU FAQ — Harriman, NY

Are ADUs allowed in Harriman, NY?

Village of Harriman has 6 districts. 5 districts allow ADUs with occupancy restrictions, 1 does not. Check your address with the free ADU checker, or confirm with the building department at (845) 782-6892.

Do I need a special permit for an ADU in Harriman?

No district in Village of Harriman requires a special-use permit for an ADU - 5 districts allow ADUs with occupancy restrictions, 1 does not. Site-plan review or a building permit may still apply.

Can I use an ADU as a short-term rental in Harriman?

No local short-term-rental law on record - which is not the same as permission for Village of Harriman. ADU occupancy and short-term-rental rules are separate: an ADU you can build isn't automatically one you can rent nightly. Confirm both before you count on STR income.

What an ADU costs to build in Harriman

Permission is one question and budget is another. An 800 sq ft accessory unit here runs roughly $205k–270k at a standard finish, and the per-square-foot rate comes in above a full house because the kitchen, bath, panel and heating plant cost the same either way. See the full cost to build an ADU in Harriman, priced by size.

ADU information for Village of Harriman is compiled from the municipal code (last reviewed 2026-07-12) and provided for decision-support only — not legal or architectural advice. ADU eligibility, size, owner-occupancy and permit conditions vary by district and often carry exceptions; verify with the building department at (845) 782-6892 before relying on any answer. Source: Offsite / Aldo zoning dataset, municipalData.js.

Building outside these counties?

Aldo covers 10 Hudson Valley & Capital Region counties today. Tell us your market — we'll build the zoning + feasibility data for it.