Aldo

ADU · Sullivan County

Can you build an ADU in Cochecton, NY?

Town of Cochecton has 6 districts. All districts prohibit ADUs. Check your address to confirm the district that applies to your parcel:

Check my address for ADU feasibility → Free · no account needed to start

What the Cochecton code indicates by district

The table below shows how each district treats ADUs, alongside the lot and setback standards that govern a second unit. District boundaries and conditions vary, so treat this as a starting point and confirm the district that applies to your parcel.

District Min lot Setbacks F / S / R Max height ADU
Agricultural Conservation District 2 ac 50 / 25 / 50 ft 35 ft No
Rural Development District 2 ac 50 / 25 / 50 ft 35 ft No
Hamlet District 2 ac 35 / 10 / 40 ft 35 ft No
Neighborhood Development District 2 ac 35 / 20 / 40 ft 35 ft No
Neighborhood Development - Residential Overlay District 2 ac 35 / 20 / 40 ft 35 ft No
Planned Unit Development 40 / 30 / 30 ft 35 ft No

ADUs vs. short-term rentals in Cochecton

No local short-term-rental law on record - which is not the same as permission for Town of Cochecton. No local STR ordinance found as of Jun 2026. The town considered STR regulation during its comprehensive plan rewrite but has not passed a local law. These are separate questions from whether you can build an ADU — a unit you're allowed to add isn't automatically one you're allowed to rent nightly, so check both.

Good to know

ADU FAQ — Cochecton, NY

Are ADUs allowed in Cochecton, NY?

Town of Cochecton has 6 districts. All districts prohibit ADUs. Check your address with the free ADU checker, or confirm with the building department at (845) 932-8360.

Do I need a special permit for an ADU in Cochecton?

No. No district in Town of Cochecton permits an ADU, so there is no permit to apply for. Codes change, so verify with the building department at (845) 932-8360 before ruling it out.

Can I use an ADU as a short-term rental in Cochecton?

No local short-term-rental law on record - which is not the same as permission for Town of Cochecton. ADU occupancy and short-term-rental rules are separate: an ADU you can build isn't automatically one you can rent nightly. Confirm both before you count on STR income.

What an ADU costs to build in Cochecton

Permission is one question and budget is another. An 800 sq ft accessory unit here runs roughly $190k–250k at a standard finish, and the per-square-foot rate comes in above a full house because the kitchen, bath, panel and heating plant cost the same either way. See the full cost to build an ADU in Cochecton, priced by size.

ADU information for Town of Cochecton is compiled from the municipal code (last reviewed 2026-08-26) and provided for decision-support only — not legal or architectural advice. ADU eligibility, size, owner-occupancy and permit conditions vary by district and often carry exceptions; verify with the building department at (845) 932-8360 before relying on any answer. Source: Offsite / Aldo zoning dataset, municipalData.js.

Building outside these counties?

Aldo covers 10 Hudson Valley & Capital Region counties today. Tell us your market — we'll build the zoning + feasibility data for it.