800 sq ft ≈ $210k–275k $263–345/sq ft 9 districts Central Hudson

An 800 sq ft accessory dwelling unit in Washington runs roughly $210k–275k, or about $263–345/sq ft, and that per-square-foot figure sits deliberately above the $215–282/sq ft a full house costs here. An ADU still needs one whole kitchen, one whole bath, its own service panel and its own heating plant no matter how small you draw it, and those costs do not shrink with the floor plan, so they land on half the square footage and push the rate up. Whether the town will let you build one is a separate question from what it costs, and it gets answered parcel by parcel rather than townwide, since the Town of Washington maps 9 districts that treat accessory units differently from one another, so read the table below as a starting point rather than a verdict.

ADU cost by size in Washington

Standard finish, slab on grade, on a flat and clear part of the lot, general-contractor margin included. These are structure costs at Dutchess County pricing, before the service and septic work a second dwelling can trigger.

SizeType$ / sq ftEstimated total
400 sq ft Studio $349–$457 $140k–185k
600 sq ft One bedroom $292–$382 $175k–230k
800 sq ft One bedroom, larger $263–$345 $210k–275k
1,000 sq ft Two bedroom $246–$322 $245k–320k

400 sq ft — One room plus a bath. Garage conversions and small backyard cottages land here.

600 sq ft — The most common detached build - a real bedroom, full kitchen, one bath.

800 sq ft — Room for a proper living area. Still a single bath and one kitchen.

1,000 sq ft — About as large as most codes allow an accessory unit to go.

Why the rate is higher than a house

The systems below are priced for an 800 sq ft unit. The middle column is what each system would cost if it simply shrank with the floor plan; the left column is what it actually costs once you account for the equipment a dwelling needs one of regardless of size. The gap between the two columns is the whole reason small builds price the way they do.

System$ / sq ft in an ADUIf it scaled with floor areaFixed per unit
Site work $8–$12 $8
Foundation $17–$24 $17
Framing $27–$34 $27
Envelope - roof, siding, windows $34–$43 $34
Plumbing $29–$36 $17 55%
Electrical $19–$25 $13 35%
HVAC $24–$30 $15 45%
Insulation $8–$10 $8
Interior finishes $34–$46 $29 15%
Millwork & cabinetry $19–$29 $12 55%

The fixed-per-unit share is a modeling assumption, not a figure from the code: it is our estimate of how much of each system's budget buys equipment a dwelling needs exactly one of - a kitchen rough-in, a bath group, a service panel, a heating plant - and therefore does not shrink when the unit does. Site work, foundation, framing, envelope and insulation are treated as scaling straight with floor area, which understates the premium slightly, because a small building carries more envelope per square foot of floor than a large one.

What the Washington code says about accessory units

Whether you can build one, and how large, is decided by the district your parcel sits in rather than by the town as a whole. The table shows how each mapped district treats ADUs alongside the lot and setback standards a second unit still has to fit inside. District boundaries and conditions vary, so treat it as a starting point and confirm the district that applies to your parcel.

District Min lot Setbacks F / S / R Max height ADU
Rural Residential 10-Acre 10 ac 100 / 100 / 75 ft 35 ft Special permit
Rural Residential Special 10-Acre 10 ac 100 / 100 / 75 ft 35 ft Special permit
Low Density Residential 5-Acre 5 ac 100 / 75 / 75 ft 35 ft Special permit
Low Density Residential Special 5 ac 100 / 75 / 75 ft 35 ft Special permit
Medium Density Residential 2-Acre 2 ac 75 / 50 / 50 ft 35 ft Special permit
High Density Residential 1-Acre 1 ac 50 / 30 / 25 ft 35 ft Special permit
Hamlet Mixed-Use 1 ac 50 / 30 / 25 ft 35 ft Special permit
Land Conservation 10 ac 100 / 100 / 75 ft 15 ft No
Hamlet (floating district) 0.25 ac 20 / 15 / 25 ft 35 ft

Rural Residential 10-Acre — Height is capped twice over: 2 1/2 stories and 35 ft. Minimum road frontage is 400 ft, published as its own column beside the lot width. For rear lot frontages see § 165-68.

Rural Residential Special 10-Acre — Height is capped twice over: 2 1/2 stories and 35 ft. Minimum road frontage is 400 ft, published as its own column beside the lot width. For rear lot frontages see § 165-68. RS-10 shares a single schedule column with RR-10.

Low Density Residential 5-Acre — Height is capped twice over: 2 1/2 stories and 35 ft. Minimum road frontage is 300 ft, published as its own column beside the lot width. For rear lot frontages see § 165-68.

Low Density Residential Special — Height is capped twice over: 2 1/2 stories and 35 ft. Minimum road frontage is 300 ft, published as its own column beside the lot width. For rear lot frontages see § 165-68. RS-5 shares a single schedule column with RL-5.

Medium Density Residential 2-Acre, High Density Residential 1-Acre — Height is capped twice over: 2 1/2 stories and 35 ft. Minimum road frontage is 200 ft, published as its own column beside the lot width. For rear lot frontages see § 165-68.

Hamlet Mixed-Use — Appendix B publishes TWO complete columns for HM. The base row here is the residential one. A NON-RESIDENTIAL use in the same district is governed by the other column: half an acre rather than one, 100 ft of lot width rather than 200, an 80 ft front yard, a 15 ft side yard, a 50 ft rear yard and 60% coverage rather than 10%. Height is capped twice over: 2 1/2 stories and 35 ft for a residential use; the non-residential column states no storey limit, only the 35 ft. Minimum road frontage is 100 ft, published as its own column beside the lot width. For rear lot frontages see § 165-68.

Land Conservation — Height is capped twice over: 1 story and 15 ft — the lowest in the Town. Minimum road frontage is 400 ft, published as its own column beside the lot width. For rear lot frontages see § 165-68.

Hamlet (floating district) — H is a FLOATING district under § 165-13: Appendix B publishes a full column of standards for it, but the district is not on the Zoning Map until the Town Board maps one, at which point it replaces the previous use classification. The setbacks above are minimums and the district also sets MAXIMUMS — a front yard of no more than 50 ft and a side yard of no more than 50 ft, which are build-to limits rather than setbacks; the rear yard has no maximum (Note 2). The quarter-acre minimum is a floor only: § 165 Appendix B Note 1 requires such greater area as the Dutchess County Department of Health demands, which on an unsewered lot is usually a great deal more. Height is capped twice over: 2 1/2 stories and 35 ft. Minimum road frontage is 50 ft, published as its own column beside the lot width. For rear lot frontages see § 165-68.

Check my address for ADU feasibility → Free · no account needed to start

Size limits on record in Washington

Where the code states a size cap, it decides which row of the cost table above actually applies to you. These are the caps recorded for Washington:

Costs an ADU adds that a house does not

Sizing up a specific parcel in Washington?

Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.

Building a full house instead?

A standard-finish house in Washington runs $215–282/sq ft, about $390k–510k at 1,800 sq ft , plus roughly $8,033 for a conforming lot. See what it costs to build a house in Washington.

ADU cost in nearby towns

ADU cost in Washington: common questions

How much does it cost to build an ADU in Washington, NY?

An 800 sq ft accessory dwelling unit in Town of Washington runs roughly $210k–275k at a standard finish, general-contractor margin included. A 400 sq ft studio runs about $140k–185k. Those are structure costs on an easy site and do not include the septic, water or electrical service work a second unit often triggers.

Why does an ADU cost more per square foot than a house in Washington?

Because a lot of a dwelling's cost is per dwelling, not per square foot. One kitchen, one bath group, one service panel and one heating plant cost about the same in an 800 sq ft cottage as in a 1,800 sq ft house, so on the smaller unit they get spread over less than half the floor area. That is why an ADU here prices at $263–345/sq ft against $215–282/sq ft for a full house, even though it is the same trades doing the same work.

Are ADUs allowed in Washington?

Town of Washington has 9 districts. 7 districts allow ADUs with a special-use permit, 1 does not. 1 district has incomplete data - verify with the building department at (845) 677-3419. Check the specific address with the free ADU checker before you spend money on design.

Can I rent an ADU in Washington short term?

Short-term rentals allowed with local rules for Town of Washington. ADU rules and short-term-rental rules are set separately, so a unit you are allowed to build is not automatically one you are allowed to rent nightly. Confirm both before you underwrite the build on short-term-rental income.

ADU costs are modeled estimates in current 2026 dollars at the Dutchess County regional index, general-contractor margin included, derived from Offsite's cost engine with a stated adjustment for the equipment a dwelling needs one of regardless of size. They are planning numbers for decision-support only - not a bid, quote, or guarantee, and not legal, architectural or engineering advice. They cover the structure and exclude septic expansion, utility service runs, site work beyond a flat and clear pad, and permit fees. ADU eligibility, size, owner-occupancy and permit conditions in the Town of Washington vary by district and often carry exceptions this page does not show; zoning last reviewed 2026-08-16; verify with the building department at (845) 677-3419 before relying on any answer. Sources: Offsite / Aldo cost engine (costEngine.js + constants.js); zoning dataset (municipalData.js).

Building outside these counties?

Aldo covers 10 Hudson Valley & Capital Region counties today. Tell us your market — we'll build the zoning + feasibility data for it.