What it costs to build an ADU in Hyde Park, NY

800 sq ft ≈ $210k–275k $263–345/sq ft 12 districts Central Hudson

An 800 sq ft accessory dwelling unit in Hyde Park runs roughly $210k–275k, or about $263–345/sq ft, and that per-square-foot figure sits deliberately above the $215–282/sq ft a full house costs here. An ADU still needs one whole kitchen, one whole bath, its own service panel and its own heating plant no matter how small you draw it, and those costs do not shrink with the floor plan, so they land on half the square footage and push the rate up. Whether the town will let you build one is a separate question from what it costs, and it gets answered parcel by parcel rather than townwide, since the Town of Hyde Park maps 12 districts that treat accessory units differently from one another, so read the table below as a starting point rather than a verdict.

ADU cost by size in Hyde Park

Standard finish, slab on grade, on a flat and clear part of the lot, general-contractor margin included. These are structure costs at Dutchess County pricing, before the service and septic work a second dwelling can trigger.

SizeType$ / sq ftEstimated total
400 sq ft Studio $349–$457 $140k–185k
600 sq ft One bedroom $292–$382 $175k–230k
800 sq ft One bedroom, larger $263–$345 $210k–275k
1,000 sq ft Two bedroom $246–$322 $245k–320k

400 sq ft — One room plus a bath. Garage conversions and small backyard cottages land here.

600 sq ft — The most common detached build - a real bedroom, full kitchen, one bath.

800 sq ft — Room for a proper living area. Still a single bath and one kitchen.

1,000 sq ft — About as large as most codes allow an accessory unit to go.

Why the rate is higher than a house

The systems below are priced for an 800 sq ft unit. The middle column is what each system would cost if it simply shrank with the floor plan; the left column is what it actually costs once you account for the equipment a dwelling needs one of regardless of size. The gap between the two columns is the whole reason small builds price the way they do.

System$ / sq ft in an ADUIf it scaled with floor areaFixed per unit
Site work $8–$12 $8
Foundation $17–$24 $17
Framing $27–$34 $27
Envelope - roof, siding, windows $34–$43 $34
Plumbing $29–$36 $17 55%
Electrical $19–$25 $13 35%
HVAC $24–$30 $15 45%
Insulation $8–$10 $8
Interior finishes $34–$46 $29 15%
Millwork & cabinetry $19–$29 $12 55%

The fixed-per-unit share is a modeling assumption, not a figure from the code: it is our estimate of how much of each system's budget buys equipment a dwelling needs exactly one of - a kitchen rough-in, a bath group, a service panel, a heating plant - and therefore does not shrink when the unit does. Site work, foundation, framing, envelope and insulation are treated as scaling straight with floor area, which understates the premium slightly, because a small building carries more envelope per square foot of floor than a large one.

What the Hyde Park code says about accessory units

Whether you can build one, and how large, is decided by the district your parcel sits in rather than by the town as a whole. The table shows how each mapped district treats ADUs alongside the lot and setback standards a second unit still has to fit inside. District boundaries and conditions vary, so treat it as a starting point and confirm the district that applies to your parcel.

District Min lot Setbacks F / S / R Max height ADU
Greenbelt 50 / 25 / 50 ft 35 ft Special permit
Waterfront 50 / 25 / 50 ft 35 ft Special permit
Neighborhood 50 / 20 / 30 ft 35 ft Special permit
Neighborhood Core 30 / 15 / 30 ft 35 ft Special permit
Hamlet 20 / 10 / 30 ft 35 ft Special permit
Hamlet Core 10 / 10 / 30 ft 40 ft Special permit
Crossroads Core 10 / 10 / 25 ft 40 ft Special permit
Landing 10 / 10 / 10 ft 35 ft Special permit
East Park Business District 20 / 10 / 20 ft 40 ft Special permit
Neighborhood Business District 20 / 10 / 20 ft 40 ft Special permit
Corridor Business District 10 / 5 / 20 ft 40 ft Special permit
Town Core District

Greenbelt — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 0.4 dwelling units per acre, printed alongside as 2.5 acres per dwelling unit, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 50 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The density excludes Army Corps and DEC regulated wetlands and everything inside the one-hundred-year flood hazard area from the parcel acreage before it is applied. Where the residual acreage after those deductions is 10 acres or less the basis is 2.0 acres per dwelling unit rather than 2.5, so a smaller parcel is allowed slightly more. For a solar farm approved under § 130-8 the impervious coverage limit is 25% rather than 15%.

Waterfront — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 0.4 dwelling units per acre, printed alongside as 2.5 acres per dwelling unit, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 50 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The density excludes Army Corps and DEC regulated wetlands and everything inside the one-hundred-year flood hazard area from the parcel acreage before it is applied. Where the residual acreage after those deductions is 10 acres or less the basis is 2.0 acres per dwelling unit rather than 2.5. For a solar farm approved under § 130-8 the impervious coverage limit is 25% rather than 15%.

Neighborhood — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 2 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 50 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth.

Neighborhood Core — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 4 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 30 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The gross floor area of any one use or structure is capped at 6,000 sq ft, which does not apply to one- and two-family dwellings, animal husbandry or agriculture.

Hamlet — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 4 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 20 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth.

Hamlet Core — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 6 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 40 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 10 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth.

Crossroads Core — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 10 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 40 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 10 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The front and side yards may both be reduced to ZERO subject to the Crossroads Core standards.

Landing — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 10 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 10 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. A lot fronting on the Hudson River may build water-dependent structures into the river with U.S. Army Corps of Engineers approval.

East Park Business District — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 8 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 40 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 20 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The gross floor area of any one use or structure is capped at 40,000 sq ft, which does not apply to one- and two-family dwellings, animal husbandry or agriculture.

Neighborhood Business District — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 8 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 40 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 20 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The gross floor area of any one use or structure is capped at 7,500 sq ft, which does not apply to one- and two-family dwellings, animal husbandry or agriculture.

Corridor Business District — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 8 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 40 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 10 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The gross floor area of any one use or structure is capped at 65,000 sq ft, which does not apply to one- and two-family dwellings, animal husbandry or agriculture.

Town Core District — The Schedule of Bulk Regulations carries a Town Core column and fills every cell in it with a footnote: the bulk regulations for TC are set out in the Town Core Design and Development Standards, not in this chapter, so no figure is recorded here. Where the Planning Board has approved a building type waiver permit, the Corridor Business District standards apply instead — 40 ft of height, 85% impervious coverage, and 10 ft front, 5 ft side and 20 ft rear yards. The town-wide 25 ft frontage requirement applies here as everywhere (§ 108-4.4E).

Check my address for ADU feasibility → Free · no account needed to start

Size limits on record in Hyde Park

Where the code states a size cap, it decides which row of the cost table above actually applies to you. These are the caps recorded for Hyde Park:

Costs an ADU adds that a house does not

Sizing up a specific parcel in Hyde Park?

Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.

Building a full house instead?

A standard-finish house in Hyde Park runs $215–282/sq ft, about $390k–510k at 1,800 sq ft . See what it costs to build a house in Hyde Park.

ADU cost in nearby towns

ADU cost in Hyde Park: common questions

How much does it cost to build an ADU in Hyde Park, NY?

An 800 sq ft accessory dwelling unit in Town of Hyde Park runs roughly $210k–275k at a standard finish, general-contractor margin included. A 400 sq ft studio runs about $140k–185k. Those are structure costs on an easy site and do not include the septic, water or electrical service work a second unit often triggers.

Why does an ADU cost more per square foot than a house in Hyde Park?

Because a lot of a dwelling's cost is per dwelling, not per square foot. One kitchen, one bath group, one service panel and one heating plant cost about the same in an 800 sq ft cottage as in a 1,800 sq ft house, so on the smaller unit they get spread over less than half the floor area. That is why an ADU here prices at $263–345/sq ft against $215–282/sq ft for a full house, even though it is the same trades doing the same work.

Are ADUs allowed in Hyde Park?

Town of Hyde Park has 12 districts. 11 of 12 districts allow ADUs with a special-use permit. 1 district has incomplete data - verify with the building department at (845) 229-5111. Check the specific address with the free ADU checker before you spend money on design.

Can I rent an ADU in Hyde Park short term?

No local short-term-rental law on record - which is not the same as permission for Town of Hyde Park. ADU rules and short-term-rental rules are set separately, so a unit you are allowed to build is not automatically one you are allowed to rent nightly. Confirm both before you underwrite the build on short-term-rental income.

ADU costs are modeled estimates in current 2026 dollars at the Dutchess County regional index, general-contractor margin included, derived from Offsite's cost engine with a stated adjustment for the equipment a dwelling needs one of regardless of size. They are planning numbers for decision-support only - not a bid, quote, or guarantee, and not legal, architectural or engineering advice. They cover the structure and exclude septic expansion, utility service runs, site work beyond a flat and clear pad, and permit fees. ADU eligibility, size, owner-occupancy and permit conditions in the Town of Hyde Park vary by district and often carry exceptions this page does not show; zoning last reviewed 2026-08-16; verify with the building department at (845) 229-5111 before relying on any answer. Sources: Offsite / Aldo cost engine (costEngine.js + constants.js); zoning dataset (municipalData.js).

Building outside these counties?

Aldo covers 10 Hudson Valley & Capital Region counties today. Tell us your market — we'll build the zoning + feasibility data for it.