Can you build an ADU in Hyde Park, NY?

Town of Hyde Park has 12 districts. 11 of 12 districts allow ADUs with a special-use permit. 1 district has incomplete data - verify with the building department at (845) 229-5111. Check your address to confirm the district that applies to your parcel:

Check my address for ADU feasibility → Free · no account needed to start

What the Hyde Park code indicates by district

The table below shows how each district treats ADUs, alongside the lot and setback standards that govern a second unit. District boundaries and conditions vary, so treat this as a starting point and confirm the district that applies to your parcel.

District Min lot Setbacks F / S / R Max height ADU
Greenbelt 50 / 25 / 50 ft 35 ft Special permit
Waterfront 50 / 25 / 50 ft 35 ft Special permit
Neighborhood 50 / 20 / 30 ft 35 ft Special permit
Neighborhood Core 30 / 15 / 30 ft 35 ft Special permit
Hamlet 20 / 10 / 30 ft 35 ft Special permit
Hamlet Core 10 / 10 / 30 ft 40 ft Special permit
Crossroads Core 10 / 10 / 25 ft 40 ft Special permit
Landing 10 / 10 / 10 ft 35 ft Special permit
East Park Business District 20 / 10 / 20 ft 40 ft Special permit
Neighborhood Business District 20 / 10 / 20 ft 40 ft Special permit
Corridor Business District 10 / 5 / 20 ft 40 ft Special permit
Town Core District

Greenbelt — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 0.4 dwelling units per acre, printed alongside as 2.5 acres per dwelling unit, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 50 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The density excludes Army Corps and DEC regulated wetlands and everything inside the one-hundred-year flood hazard area from the parcel acreage before it is applied. Where the residual acreage after those deductions is 10 acres or less the basis is 2.0 acres per dwelling unit rather than 2.5, so a smaller parcel is allowed slightly more. For a solar farm approved under § 130-8 the impervious coverage limit is 25% rather than 15%.

Waterfront — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 0.4 dwelling units per acre, printed alongside as 2.5 acres per dwelling unit, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 50 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The density excludes Army Corps and DEC regulated wetlands and everything inside the one-hundred-year flood hazard area from the parcel acreage before it is applied. Where the residual acreage after those deductions is 10 acres or less the basis is 2.0 acres per dwelling unit rather than 2.5. For a solar farm approved under § 130-8 the impervious coverage limit is 25% rather than 15%.

Neighborhood — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 2 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 50 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth.

Neighborhood Core — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 4 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 30 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The gross floor area of any one use or structure is capped at 6,000 sq ft, which does not apply to one- and two-family dwellings, animal husbandry or agriculture.

Hamlet — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 4 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 20 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth.

Hamlet Core — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 6 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 40 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 10 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth.

Crossroads Core — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 10 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 40 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 10 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The front and side yards may both be reduced to ZERO subject to the Crossroads Core standards.

Landing — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 10 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 35 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 10 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. A lot fronting on the Hudson River may build water-dependent structures into the river with U.S. Army Corps of Engineers approval.

East Park Business District — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 8 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 40 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 20 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The gross floor area of any one use or structure is capped at 40,000 sq ft, which does not apply to one- and two-family dwellings, animal husbandry or agriculture.

Neighborhood Business District — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 8 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 40 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 20 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The gross floor area of any one use or structure is capped at 7,500 sq ft, which does not apply to one- and two-family dwellings, animal husbandry or agriculture.

Corridor Business District — The Schedule of Bulk Regulations sets NO minimum lot area anywhere in Hyde Park, and § 108-4.4 adds none — it controls height, size, coverage, yards and frontage only. What it publishes instead is a maximum AVERAGE density, here 8 dwelling units per acre, which is what the land-per-unit figure carries. It is an average across a parcel rather than a floor under a single lot, so it does not by itself make a smaller lot unlawful. The only lot dimension the chapter does impose is frontage: no building permit issues for a lot with less than 25 ft of frontage on a street, and none at all below 15 ft without a variance (§ 108-4.4E). Coverage is IMPERVIOUS coverage — everything occupied, surfaced or covered by impervious material, buildings included — not building footprint (§ 108-4.4C). An accessory structure is capped at 22 ft against the 40 ft for a principal building, and one 15 ft or lower may stand at the full front setback but only half the side and rear, never closer than 5 ft; that relief does not apply to an accessory structure containing a dwelling unit, which takes the principal-building standards. A shed sets back 10 ft at the front and 5 ft at the side and rear. Every dwelling unit needs at least 400 sq ft of floor area and a least dimension of 16 ft. On a corner lot the side yard facing the side street must equal the front yard depth. The gross floor area of any one use or structure is capped at 65,000 sq ft, which does not apply to one- and two-family dwellings, animal husbandry or agriculture.

Town Core District — The Schedule of Bulk Regulations carries a Town Core column and fills every cell in it with a footnote: the bulk regulations for TC are set out in the Town Core Design and Development Standards, not in this chapter, so no figure is recorded here. Where the Planning Board has approved a building type waiver permit, the Corridor Business District standards apply instead — 40 ft of height, 85% impervious coverage, and 10 ft front, 5 ft side and 20 ft rear yards. The town-wide 25 ft frontage requirement applies here as everywhere (§ 108-4.4E).

ADUs vs. short-term rentals in Hyde Park

No local short-term-rental law on record - which is not the same as permission for Town of Hyde Park. No local STR law adopted as of Jun 2026 (proposed local law under review as of 2025). Dutchess County occupancy tax registration required. Verify with Town of Hyde Park Building Dept at (845) 229-5111 for any recent adoptions. These are separate questions from whether you can build an ADU — a unit you're allowed to add isn't automatically one you're allowed to rent nightly, so check both.

Good to know

ADU FAQ — Hyde Park, NY

Are ADUs allowed in Hyde Park, NY?

Town of Hyde Park has 12 districts. 11 of 12 districts allow ADUs with a special-use permit. 1 district has incomplete data - verify with the building department at (845) 229-5111. Check your address with the free ADU checker.

Do I need a special permit for an ADU in Hyde Park?

It depends on the district: 11 of 12 require a special-use permit, the rest do not. Check the district that applies to your parcel before you design.

Can I use an ADU as a short-term rental in Hyde Park?

No local short-term-rental law on record - which is not the same as permission for Town of Hyde Park. ADU occupancy and short-term-rental rules are separate: an ADU you can build isn't automatically one you can rent nightly. Confirm both before you count on STR income.

What an ADU costs to build in Hyde Park

Permission is one question and budget is another. An 800 sq ft accessory unit here runs roughly $210k–275k at a standard finish, and the per-square-foot rate comes in above a full house because the kitchen, bath, panel and heating plant cost the same either way. See the full cost to build an ADU in Hyde Park, priced by size.

ADU information for Town of Hyde Park is compiled from the municipal code (last reviewed 2026-08-16) and provided for decision-support only — not legal or architectural advice. ADU eligibility, size, owner-occupancy and permit conditions vary by district and often carry exceptions; verify with the building department at (845) 229-5111 before relying on any answer. Source: Offsite / Aldo zoning dataset, municipalData.js.