Town of Rosendale, NY: zoning for new construction

9 districts Min residential lot 0.17–1.5 ac Central Hudson

Residential lots in the Town of Rosendale run from a 0.17-acre minimum in R-3 Residence up to 1.5 acres in A-1 Trailer, across 9 zoning districts in all. Short-term rentals allowed with registration. Power here is Central Hudson territory. The district table below has the setbacks, height limits and coverage - confirm the specifics with the building department at (845) 658-3159 before you rely on a figure.

Looking specifically at an accessory dwelling unit? See ADU rules for Rosendale →

Zoning districts

District Min lot Setbacks F / S / R Max height ADU
A Residence 1.5 ac 50 / 30 / 50 ft 35 ft As of right
A-1 Trailer 1.5 ac 50 / 30 / 50 ft 35 ft As of right
R-1 Residence 1 ac 35 / 20 / 35 ft 35 ft As of right
R-2 Residence 1 ac 35 / 20 / 35 ft 35 ft As of right
R-2a Residence 1 ac 35 / 20 / 35 ft 35 ft As of right
R-3 Residence 0.17 ac 25 / 10 / 25 ft 35 ft As of right
B-1 General Business 0.23 ac 35 / 12.5 / 35 ft 30 ft As of right
B-2 Business 0.23 ac 40 / 25 / 40 ft 40 ft As of right
I-1 Light Industrial 0.46 ac 50 / 25 / 50 ft 40 ft No

A Residence, A-1 Trailer — A and A-1 share one row and it does not vary with utility service. See §§ 75-12 through 75-17 for supplementary regulations governing minimum lot dimensions (schedule note **).

R-1 Residence — R-1 reaches half an acre on both community sewer and water; R-2 and R-2a reach 12,500 sq ft on the same row, so the districts diverge only at the bottom of the ladder. See §§ 75-12 through 75-17 for supplementary regulations governing minimum lot dimensions (schedule note **).

R-2 Residence, R-2a Residence — See §§ 75-12 through 75-17 for supplementary regulations governing minimum lot dimensions (schedule note **).

R-3 Residence — R-3'S ONLY ROW ASSUMES SERVICE. The schedule prints it as "R-3: With S or W only" — the district publishes no standard for a lot with neither community sewer nor community water. That is a disjunction and cannot be stated as a basis, so it is recorded here. Multifamily and two-family DENSITY in R-3, B-1 and B-2 is calculated under § 75-28.D(5), not read off this schedule (note b), and lot area for a mixed-use lot or building under § 75-15 (note c). Neither prints a figure here. See §§ 75-12 through 75-17 for supplementary regulations governing minimum lot dimensions (schedule note **).

B-1 General Business — THE BASE ROW IS "Elsewhere in Town". B-1 has a second row for MAIN STREET in the Hamlet of Rosendale: 5,000 sq ft of lot, 50 ft width, no front and no side yard, 20 ft rear, 40 ft height and 50% coverage. Whether a lot is on Main Street is not a condition axis, so that row is stated here. Note (a) sends residential lot and yard dimensions to the R-2 District — recorded as variants — except on Main Street, where R-3's standards apply instead. Multifamily and two-family DENSITY in R-3, B-1 and B-2 is calculated under § 75-28.D(5), not read off this schedule (note b), and lot area for a mixed-use lot or building under § 75-15 (note c). Neither prints a figure here. See §§ 75-12 through 75-17 for supplementary regulations governing minimum lot dimensions (schedule note **).

B-2 Business — Note (a) sends residential lot and yard dimensions in B-2 to the R-2 District, recorded here as variants. Multifamily and two-family DENSITY in R-3, B-1 and B-2 is calculated under § 75-28.D(5), not read off this schedule (note b), and lot area for a mixed-use lot or building under § 75-15 (note c). Neither prints a figure here. See §§ 75-12 through 75-17 for supplementary regulations governing minimum lot dimensions (schedule note **).

I-1 Light Industrial — The schedule prints "Not permitted" in I-1's area-per-dwelling-unit column: no residential density is published for this district at all. See §§ 75-12 through 75-17 for supplementary regulations governing minimum lot dimensions (schedule note **).

Short-term rentals

Short-term rentals allowed with registration. Short-term transient rental permit required under Local Law No. 5 of 2024. Permitted as an accessory use in residential zones (A, A-1, B-1, B-2, R-1, R-2, R-2a, R-3) upon receipt of a permit. Contact Town of Rosendale at (845) 658-3159 for current fee and application. Municipal source

Good to know

Working out a budget? A standard-finish build here runs $206–$270/sq ft , and a conforming lot adds about $1,757 on top - see the full cost to build a house in Rosendale, or what an ADU costs here.

Sizing up a specific parcel in Rosendale?

Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.

Other Ulster County towns

Zoning figures for Town of Rosendale are compiled from the municipal code (last reviewed Apr 2026) and provided for decision-support only - not legal, engineering, or architectural advice. Setback and dimensional standards often carry conditions and exceptions; verify with the building department at (845) 658-3159 before relying on any number. Source: Offsite / Aldo zoning dataset, municipalData.js.