Aldo

Columbia County

Town of Kinderhook, NY: zoning for new construction

9 districts Min residential lot 0.69–8.0349 ac Central Hudson

Residential lots in the Town of Kinderhook run from a 0.69-acre minimum in Hamlet up to 8.0349 acres in Mobile Home Park, across 9 zoning districts in all. No local short-term-rental law on record - which is not the same as permission. Power here is Central Hudson territory. The district table below has the setbacks, height limits and coverage - confirm the specifics with the building department at (518) 784-2233 before you rely on a figure.

Looking specifically at an accessory dwelling unit? See ADU rules for Kinderhook →

Zoning districts

District Min lot Setbacks F / S / R Max height ADU
Residential (1-acre min) 1 ac 50 / 50 / 50 ft 35 ft Special permit
Agricultural Residential 2.5 ac 50 / 50 / 50 ft 35 ft Special permit
Hamlet 0.69 ac 35 / 25 / 35 ft 35 ft Special permit
Residential (1.5-acre min) 1.5 ac 50 / 50 / 50 ft 35 ft Special permit
Business 1 ac 50 / 25 / 35 ft 40 ft No
Business (Limited) 1 ac 50 / 25 / 35 ft 40 ft No
Light Industrial 1 ac 50 / 25 / 50 ft 40 ft No
Flood Plain 1 ac 50 / 25 / 50 ft 35 ft No
Mobile Home Park 8.0349 ac

Residential (1-acre min) — The base row is the RESIDENTIAL table. A nonresidential use in R-2 needs TWO acres, double the residential minimum. Density is one dwelling unit per 2 acres against a 1-acre minimum lot, so the two are different questions. Max 2 1/2 stories. The front yard is 75 ft on a STATE OR COUNTY HIGHWAY (schedule note 2, both tables). Minimum road frontage is 50 ft in every district. See § 250-15 for height exceptions. Conservation subdivision is available at Planning Board discretion under § 250-27 and Chapter 215 Article IV, outside the Prime Farmland Overlay District. Schedule note 1 exempts lots in a conservation subdivision from the minimum lot WIDTH above; the lot-size and density rules for them live in § 215-20, which this pass did not read.

Agricultural Residential — The base row is the RESIDENTIAL table. A nonresidential use in AR needs LESS land — 2 acres against 2.5 — and 250 ft of width against 300. Density is one dwelling unit per 5 acres. Max 2 1/2 stories. The front yard is 75 ft on a STATE OR COUNTY HIGHWAY (schedule note 2, both tables). Minimum road frontage is 50 ft in every district. See § 250-15 for height exceptions. Conservation subdivision is available at Planning Board discretion under § 250-27 and Chapter 215 Article IV, outside the Prime Farmland Overlay District. Schedule note 1 exempts lots in a conservation subdivision from the minimum lot WIDTH above; the lot-size and density rules for them live in § 215-20, which this pass did not read.

Hamlet — The base row is the RESIDENTIAL table. A nonresidential use in H needs 20,000 sq ft against the residential 30,000, but 125 ft of width against 90 — a smaller, wider lot. Max 2 1/2 stories. The front yard is 75 ft on a STATE OR COUNTY HIGHWAY (schedule note 2, both tables). Minimum road frontage is 50 ft in every district. See § 250-15 for height exceptions. Conservation subdivision is available at Planning Board discretion under § 250-27 and Chapter 215 Article IV, outside the Prime Farmland Overlay District. Schedule note 1 exempts lots in a conservation subdivision from the minimum lot WIDTH above; the lot-size and density rules for them live in § 215-20, which this pass did not read.

Residential (1.5-acre min) — The base row is the RESIDENTIAL table. A nonresidential use in R-3 needs THREE acres, double the residential 1.5. Density is one dwelling unit per 3 acres. Max 2 1/2 stories. The front yard is 75 ft on a STATE OR COUNTY HIGHWAY (schedule note 2, both tables). Minimum road frontage is 50 ft in every district. See § 250-15 for height exceptions. Conservation subdivision is available at Planning Board discretion under § 250-27 and Chapter 215 Article IV, outside the Prime Farmland Overlay District. Schedule note 1 exempts lots in a conservation subdivision from the minimum lot WIDTH above; the lot-size and density rules for them live in § 215-20, which this pass did not read.

Business — THE BASE ROW IS THE NONRESIDENTIAL TABLE. A dwelling in B-1 takes the residential row instead — half an acre, 50 ft side and rear yards and 20% coverage, against an acre, 25 ft, 35 ft and 50% here. Maximum building footprint for a nonresidential structure is 40,000 sq ft. A GREEN SPACE 35 ft deep from the right-of-way is required for residential use, with no buildings or parking in it (residential note 4). Max 3 stories. The front yard is 75 ft on a STATE OR COUNTY HIGHWAY (schedule note 2, both tables). Minimum road frontage is 50 ft in every district. See § 250-15 for height exceptions.

Business (Limited) — THE BASE ROW IS THE NONRESIDENTIAL TABLE. A dwelling in B-1A takes the residential row instead — half an acre, 50 ft side and rear yards and 20% coverage, against an acre, 25 ft, 35 ft and 75% here. Maximum building footprint is 20,000 sq ft for a new commercial, retail or wholesale structure and 30,000 sq ft for a new office or warehouse, each covering no more than 75% of the lot. Max 3 stories. The front yard is 75 ft on a STATE OR COUNTY HIGHWAY (schedule note 2, both tables). Minimum road frontage is 50 ft in every district. See § 250-15 for height exceptions.

Light Industrial — The base row is the NONRESIDENTIAL table. The residential table gives I-1 yards of 50/25/50 but publishes NO minimum lot size, lot width or density for it, so no residential variant is recorded — the schedule states no residential standard to carry. Max 3 stories. The front yard is 75 ft on a STATE OR COUNTY HIGHWAY (schedule note 2, both tables). Minimum road frontage is 50 ft in every district. See § 250-15 for height exceptions.

Flood Plain — The base row is the NONRESIDENTIAL table. The residential table gives FP yards of 50/25/50 but publishes NO minimum lot size, lot width or density for it, so no residential variant is recorded. Max 2 1/2 stories. Floodplain District — see § 250-28. The front yard is 75 ft on a STATE OR COUNTY HIGHWAY (schedule note 2, both tables). Minimum road frontage is 50 ft in every district. See § 250-15 for height exceptions.

Mobile Home Park — MHP is the ninth base district in § 250-3 and the Density Control Schedule gives it one line: 350,000 square feet per PARK and 10,000 square feet per HOME, with 50 ft of road frontage, and everything else referred to § 250-24 (Mobile homes and trailer camps), which this pass did not read. minLotSize is the park; landPerDwellingUnitSf is the home. The schedule publishes no yard, height or coverage figure for the district at all.

Short-term rentals

No local short-term-rental law on record - which is not the same as permission. No STR-specific local law found for the Town of Kinderhook as of Jun 2026. Note: the Village of Kinderhook has its own STR law. Columbia County occupancy tax applies.

Good to know

Working out a budget? A standard-finish build here runs $202–$265/sq ft , and a conforming lot adds about $13,106 on top - see the full cost to build a house in Kinderhook, or what an ADU costs here.

Sizing up a specific parcel in Kinderhook?

Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.

Other Columbia County towns

Zoning figures for Town of Kinderhook are compiled from the municipal code (last reviewed 2026-08-16) and provided for decision-support only - not legal, engineering, or architectural advice. Setback and dimensional standards often carry conditions and exceptions; verify with the building department at (518) 784-2233 before relying on any number. Source: Offsite / Aldo zoning dataset, municipalData.js.

Building outside these counties?

Aldo covers 10 Hudson Valley & Capital Region counties today. Tell us your market — we'll build the zoning + feasibility data for it.