Hilton · build cost

What it costs to build a house in Hilton, NY

Standard $204–268/sq ft 1,800 sq ft ≈ $370k–480k Min lot 0.1837 ac

A standard-finish house in Hilton runs about $204–268/sq ft all in, which on a 1,800 sq ft build works out to roughly $370k–480k with general-contractor margin already in it. Before any of that you need a lot that conforms, and the smallest residential minimum in the Village of Hilton is 0.1837 acres, which is the first real cost of building here and the one that varies most from one village to the next. What the code will let you put on that lot is rarely the binding constraint, since even Residential (R) — 8,000 sf (0.18 acres) with 60 ft of lot width, side setback 8 ft, rear setback 8 ft, maximum dwelling height 35 ft and a MAXIMUM BUILDING LOT COVERAGE OF 70%, by a wide margin the highest residential coverage allowance recorded in Monroe County. THE FRONT SETBACK IS CONTEXTUAL, NOT FIXED, AND THE RECORDED 20 FT IS A FALLBACK RATHER THAN A STANDARD. Schedule 2 footnote 7 provides that 'the minimum front setback for lots abutting roads shall be THE MOST COMMON EXISTING FRONT SETBACK ON THE BLOCK', and only 'in the event that the most common front setback does not exist or cannot be determined' does the 20 ft figure apply. On any built-up Hilton street the neighbours set the building line, not the schedule, so 20 ft is the floor for a greenfield or indeterminate case and must not be quoted as the requirement without walking the block. ACCESSORY BUILDINGS ARE REGULATED SEPARATELY AND BY TYPE, which is unusual: a shed takes 5 ft side and rear setbacks, a 16 ft height cap and a 256 sf footprint cap, while a garage takes 8 ft side and rear, a 25 ft height cap and a 720 sf footprint cap. Both must be erected BEHIND the front main foundation line of the principal dwelling (footnote 1), which is why the accessory front setback reads 'not specified'. THE 70% COVERAGE FIGURE IS A BUILDING-LOT-COVERAGE FIGURE, and combined with the 256 sf and 720 sf accessory footprint caps it means the constraint on a Hilton lot is the setback envelope and the accessory caps rather than the percentage. THE USE LIST IS THE MOST PERMISSIVE IN THE COUNTY — see `aduNotes`: by special permit under Article IV the R District admits a two-family dwelling, single-family attached, a small apartment house, cottage court dwellings, live-work units, an accessory dwelling unit and short-term rentals, none of which appear together in any other Monroe jurisdiction., the tightest residential district here, allows a building footprint of roughly 5,601 sq ft on a conforming lot, which is more house than the budget above actually buys. The figures below come out of the same cost engine Aldo uses to price a real parcel, broken out by system and by what a harder site adds, so you can see where the money actually goes.

Cost per square foot by finish level

All in, general-contractor margin included, for a slab-on-grade build on a flat and clear lot. The rate holds steady whether you build 1,200 or 2,500 sq ft, which is why the finish level moves a budget more than the size does.

Finish level$ / sq ft1,800 sq ft total
Standard $204–$268 $370k–480k
Custom $272–$405 $490k–730k
Luxury $415–$717 $745k–1.29M

Standard — Builder-grade but solid - stock cabinetry, mid-range windows, standard fixtures. What most spec cabins and rental builds run.

Custom — Better envelope, upgraded windows and doors, semi-custom millwork and fixtures. The typical Hudson Valley owner-build.

Luxury — High-performance envelope, custom cabinetry, designer fixtures and specialty finishes. Architect-driven, no stock parts.

Where the money goes

A standard-finish build at Monroe County pricing, broken out by trade as dollars per square foot. Foundation and site work here are the slab and flat-lot baseline, so a harder site stacks on top of them.

System$ / sq ft
Site work $7–$11
Foundation $16–$23
Framing $25–$32
Envelope - roof, siding, windows $32–$41
Plumbing $16–$20
Electrical $13–$16
HVAC $15–$18
Insulation $7–$9
Interior finishes $27–$36
Millwork & cabinetry $11–$16

What moves the number

The baseline assumes the easy case. Each of these stacks on top, per square foot, at Monroe County pricing:

Whole-project totals

Standard finish, slab on a flat lot, all in and before land. A harder site or a higher finish moves these up.

Home sizeEstimated build cost
1,200 sq ft $245k–320k
1,800 sq ft $370k–480k
2,500 sq ft $510k–670k

How much house Hilton actually lets you build

Every residential district caps how much of the lot the building can cover. Multiply that cap by the district's minimum lot size and you get the largest footprint the code permits on a conforming lot in the Village of Hilton, which runs from about 5,601 sq ft in Residential (R) — 8,000 sf (0.18 acres) with 60 ft of lot width, side setback 8 ft, rear setback 8 ft, maximum dwelling height 35 ft and a MAXIMUM BUILDING LOT COVERAGE OF 70%, by a wide margin the highest residential coverage allowance recorded in Monroe County. THE FRONT SETBACK IS CONTEXTUAL, NOT FIXED, AND THE RECORDED 20 FT IS A FALLBACK RATHER THAN A STANDARD. Schedule 2 footnote 7 provides that 'the minimum front setback for lots abutting roads shall be THE MOST COMMON EXISTING FRONT SETBACK ON THE BLOCK', and only 'in the event that the most common front setback does not exist or cannot be determined' does the 20 ft figure apply. On any built-up Hilton street the neighbours set the building line, not the schedule, so 20 ft is the floor for a greenfield or indeterminate case and must not be quoted as the requirement without walking the block. ACCESSORY BUILDINGS ARE REGULATED SEPARATELY AND BY TYPE, which is unusual: a shed takes 5 ft side and rear setbacks, a 16 ft height cap and a 256 sf footprint cap, while a garage takes 8 ft side and rear, a 25 ft height cap and a 720 sf footprint cap. Both must be erected BEHIND the front main foundation line of the principal dwelling (footnote 1), which is why the accessory front setback reads 'not specified'. THE 70% COVERAGE FIGURE IS A BUILDING-LOT-COVERAGE FIGURE, and combined with the 256 sf and 720 sf accessory footprint caps it means the constraint on a Hilton lot is the setback envelope and the accessory caps rather than the percentage. THE USE LIST IS THE MOST PERMISSIVE IN THE COUNTY — see `aduNotes`: by special permit under Article IV the R District admits a two-family dwelling, single-family attached, a small apartment house, cottage court dwellings, live-work units, an accessory dwelling unit and short-term rentals, none of which appear together in any other Monroe jurisdiction. to 6,402 sq ft in Multiple-Residence (MR) — 8,000 sf minimum lot with NO MINIMUM LOT WIDTH STATED, a 35 ft height cap and an 80% maximum building lot coverage, the highest in the village. Apartment houses, multiple dwellings, dwelling groups, condominiums and cooperatives are permitted OUTRIGHT here, unlike the R District where every multi-unit form needs a special permit. MR IS A FLOATING DISTRICT RATHER THAN A MAPPED ONE, AND THAT IS THE MOST IMPORTANT FACT ABOUT IT: § 275-14A states that 'an area shall be zoned as an MR District ONLY UPON APPLICATION FOR A SPECIFIC PROPOSAL in accordance with the normal rezoning procedures'. So MR does not sit on the zoning map waiting to be used — a developer must apply to have land rezoned into it, scheme in hand, and the Village Board weighs the proposal against the chapter's general criteria and the current Comprehensive Plan. The stated purpose is explicit that the Village does not want multiple-family development at a scale where 'large areas of the Village become so devoted to such use that single-family residences would appear out of place', which is a policy brake on top of the rezoning discretion. Treat MR capacity as an outcome of a political process, not as an entitlement attaching to any parcel. THE SETBACKS ARE NOT IN THE SCHEDULE'S NORMAL COLUMNS — the row reads 'see notes section' and footnote 2 supplies them in project terms rather than lot terms: no building nearer than 30 FT to the right-of-way of any MAJOR ROAD PERIPHERAL TO THE SITE, no building nearer than 15 FT to the right-of-way of any EXTERIOR PROJECT ROAD (measured from the limits of the paved area where the street is not dedicated), and no building nearer than 15 FT to any INTERIOR LOT LINE other than lot lines defining an individual townhouse unit. The recorded front 30, side 15 and rear 15 map those project-perimeter figures onto the conventional fields; they are not per-lot setbacks in the ordinary sense and a townhouse party-wall line is expressly exempt.. Worth checking before you assume zoning is what is limiting the house, because in most districts it is the budget that runs out first.

DistrictMin lotLot coverageMax footprintMax height
Residential (R) — 8,000 sf (0.18 acres) with 60 ft of lot width, side setback 8 ft, rear setback 8 ft, maximum dwelling height 35 ft and a MAXIMUM BUILDING LOT COVERAGE OF 70%, by a wide margin the highest residential coverage allowance recorded in Monroe County. THE FRONT SETBACK IS CONTEXTUAL, NOT FIXED, AND THE RECORDED 20 FT IS A FALLBACK RATHER THAN A STANDARD. Schedule 2 footnote 7 provides that 'the minimum front setback for lots abutting roads shall be THE MOST COMMON EXISTING FRONT SETBACK ON THE BLOCK', and only 'in the event that the most common front setback does not exist or cannot be determined' does the 20 ft figure apply. On any built-up Hilton street the neighbours set the building line, not the schedule, so 20 ft is the floor for a greenfield or indeterminate case and must not be quoted as the requirement without walking the block. ACCESSORY BUILDINGS ARE REGULATED SEPARATELY AND BY TYPE, which is unusual: a shed takes 5 ft side and rear setbacks, a 16 ft height cap and a 256 sf footprint cap, while a garage takes 8 ft side and rear, a 25 ft height cap and a 720 sf footprint cap. Both must be erected BEHIND the front main foundation line of the principal dwelling (footnote 1), which is why the accessory front setback reads 'not specified'. THE 70% COVERAGE FIGURE IS A BUILDING-LOT-COVERAGE FIGURE, and combined with the 256 sf and 720 sf accessory footprint caps it means the constraint on a Hilton lot is the setback envelope and the accessory caps rather than the percentage. THE USE LIST IS THE MOST PERMISSIVE IN THE COUNTY — see `aduNotes`: by special permit under Article IV the R District admits a two-family dwelling, single-family attached, a small apartment house, cottage court dwellings, live-work units, an accessory dwelling unit and short-term rentals, none of which appear together in any other Monroe jurisdiction. 0.1837 ac 70% 5,601 sq ft 35 ft
Multiple-Residence (MR) — 8,000 sf minimum lot with NO MINIMUM LOT WIDTH STATED, a 35 ft height cap and an 80% maximum building lot coverage, the highest in the village. Apartment houses, multiple dwellings, dwelling groups, condominiums and cooperatives are permitted OUTRIGHT here, unlike the R District where every multi-unit form needs a special permit. MR IS A FLOATING DISTRICT RATHER THAN A MAPPED ONE, AND THAT IS THE MOST IMPORTANT FACT ABOUT IT: § 275-14A states that 'an area shall be zoned as an MR District ONLY UPON APPLICATION FOR A SPECIFIC PROPOSAL in accordance with the normal rezoning procedures'. So MR does not sit on the zoning map waiting to be used — a developer must apply to have land rezoned into it, scheme in hand, and the Village Board weighs the proposal against the chapter's general criteria and the current Comprehensive Plan. The stated purpose is explicit that the Village does not want multiple-family development at a scale where 'large areas of the Village become so devoted to such use that single-family residences would appear out of place', which is a policy brake on top of the rezoning discretion. Treat MR capacity as an outcome of a political process, not as an entitlement attaching to any parcel. THE SETBACKS ARE NOT IN THE SCHEDULE'S NORMAL COLUMNS — the row reads 'see notes section' and footnote 2 supplies them in project terms rather than lot terms: no building nearer than 30 FT to the right-of-way of any MAJOR ROAD PERIPHERAL TO THE SITE, no building nearer than 15 FT to the right-of-way of any EXTERIOR PROJECT ROAD (measured from the limits of the paved area where the street is not dedicated), and no building nearer than 15 FT to any INTERIOR LOT LINE other than lot lines defining an individual townhouse unit. The recorded front 30, side 15 and rear 15 map those project-perimeter figures onto the conventional fields; they are not per-lot setbacks in the ordinary sense and a townhouse party-wall line is expressly exempt. 0.1837 ac 80% 6,402 sq ft 35 ft

Footprint is the ground-floor building area, so a second storey buys floor area this number does not constrain, subject to the height limit. Some municipalities write their coverage cap as impervious surface rather than building coverage, which counts the driveway, walks and patio against the same budget and leaves less of it for the house - check which one your district uses before you design to it.

Local rules that move a build budget in Hilton

Sizing up a specific parcel in Hilton?

Aldo pulls the exact zoning district, setbacks, and build feasibility for any parcel — before you buy. Enter your email to open Aldo and run your free report.

Building an accessory unit instead?

An 800 sq ft ADU in Hilton runs about $200k–260k, and the per-square-foot rate is higher than a full house because the kitchen, bath, panel and heating plant cost the same either way. See what it costs to build an ADU in Hilton, priced by size.

Cost to build in nearby towns

Cost to build in Hilton: common questions

How much does it cost to build a house in Hilton, NY?

A standard-finish new build in Village of Hilton runs about $204–268/sq ft all in, general-contractor margin included, which puts a 1,800 sq ft house at roughly $370k–480k. A full basement, a sloped or wooded site, or a winter foundation pour each add to that, and a custom or luxury finish level moves it up again.

What is the cheapest way to build in Hilton?

The three levers that move a budget most here are finish level, foundation and site. Standard finish on a slab, on a flat and already-cleared lot, in the warm season, is the floor - every step away from that combination is priced in the tables above. Square footage matters less than people expect, because the per-square-foot rate barely moves between a 1,200 and a 2,500 sq ft house; what changes is the total.

Do I need a bigger lot to build in Hilton?

The smallest residential minimum lot size in Village of Hilton is 0.1837 acres. Which minimum applies depends on the district your parcel sits in, so confirm the district before you assume a lot is buildable.

Does it cost more to build in winter in Hilton?

Yes. Foundation and site work carry a winter premium because of frost protection, heating and ground conditions, and at Monroe County pricing that works out to about +$2.8–4/sq ft across the whole build. It is usually cheaper to wait for spring than to pay it, unless the schedule is already costing you more somewhere else.

Construction figures are modeled estimates from Offsite's cost engine in current 2026 dollars, general-contractor margin included, using the Monroe County regional index. They are planning numbers for decision-support only - not a bid, quote, or guarantee, and not architectural or engineering advice. Zoning figures for the Village of Hilton come from the municipal code (last reviewed 2026-08-13) and can carry district exceptions and overlays this page does not show. Actual cost depends on the specific parcel, design, site conditions and market at the time you build; verify with the building department at (585) 392-4144 and get a real estimate before you commit. Sources: Offsite / Aldo cost engine (costEngine.js + constants.js); zoning dataset (municipalData.js) .

Building outside these counties?

Aldo covers 10 Hudson Valley & Capital Region counties today. Tell us your market — we'll build the zoning + feasibility data for it.